Condition score
43
Replacement value
$284M
Annual rent roll
$4.3M
Open deficiencies
$50.0M
The next level down the hierarchy (line-of-sight roll-up).
| Asset | Level | Class | Condition | CRV |
|---|---|---|---|---|
| Cruise Terminal Pier 90 · Bulkhead | System | Bulkhead | 54 | $28.4M |
| Cruise Terminal Pier 90 · Deck & Apron | System | Wharf | 42 | $56.8M |
| Cruise Terminal Pier 90 · Fender System | System | Fender | 46 | $28.4M |
| Cruise Terminal Pier 90 · Marine Substructure | System | Wharf | 46 | $99.4M |
| Cruise Terminal Pier 90 · Piles & Pile Caps | System | Pile | 45 | $71.0M |
Drawings, photos, certificates and reports attached to this asset.
| Title | Kind | Source | Uploaded |
|---|---|---|---|
| Cruise Terminal Pier 90 — Exterior Photo | photo | Synthetic | Jul 17, 2026 |
| Cruise Terminal Pier 90 — Marine Structural Drawing | drawing | Synthetic | Jul 17, 2026 |
| Cruise Terminal Pier 90 — Condition Inspection Report | report | Synthetic | Jul 17, 2026 |