Facility Condition Index, the priced deferred-maintenance backlog, and the inspection signals that drive the capital plan — every EDC facility in one place. FCI is a cost ratio (backlog ÷ replacement value): lower is better.
Portfolio-wide FCI
0.080
Deferred maintenance
$676M
Open deficiencies
242
Facilities poor+
13
Backlog reconciliation: the $675,749,286 backlog is the sum of the estimated cost of every unresolved deficiency (open + in‑work‑order + in‑capital‑project + deferred) and equals the rolled-up facility FCI-snapshot backlog as of Jun 30, 2026 ✓.
Maritime carries a poor 0.117 FCI — $418M of deferred backlog against $3.58B of replacement value. Below-water WFMMS dive inspections flagged critical section-loss on the piers below.
Critical underwater utilities deterioration — marine inspection
SBMT Wharf & Heavy-Lift PadCritical piles deterioration — marine inspection
SBMT Wharf & Heavy-Lift PadPiles repair required — marine inspection
Unresolved deficiency cost by Uniformat / marine system
Age of unresolved deficiencies (identified date → today)
| Facility | Portfolio | FCI | Band | Backlog | Replacement value |
|---|---|---|---|---|---|
| SBMT Wharf & Heavy-Lift Pad wharf | Maritime | 0.189 | Poor | $138M | $728M |
| Cruise Terminal Pier 90 pier | Maritime | 0.176 | Poor | $50.0M | $284M |
| Corlears Hook (Lower East Side) Landing Barge & Gangway ferry landing | NYC Ferry | 0.109 |
Every dollar of deferred maintenance today becomes roughly $4 of future renewal cost. Left unfunded, today's $676M backlog escalates toward $2.70B — the budget-defense case for funding the condition backlog now.
Pile caps repair required — marine inspection
Waterfront Structure| Poor |
| $731K |
| $6.7M |
| Waterfront Structure pier | Maritime | 0.107 | Poor | $23.8M | $222M |
| Wall St / Pier 11 Landing Barge & Gangway ferry landing | NYC Ferry | 0.107 | Poor | $549K | $5.1M |
| Waterfront Structure pier | Maritime | 0.106 | Poor | $73.3M | $691M |
| Roosevelt Island Landing Barge & Gangway ferry landing | NYC Ferry | 0.106 | Poor | $449K | $4.2M |
| South Williamsburg (Schaefer Landing) Landing Barge & Gangway ferry landing | NYC Ferry | 0.105 | Poor | $600K | $5.7M |
| Battery Park City / Vesey St (Brookfield Place) Landing Barge & Gangway ferry landing | NYC Ferry | 0.105 | Poor | $600K | $5.7M |
| Sunset Park / Brooklyn Army Terminal Landing Barge & Gangway ferry landing | NYC Ferry | 0.105 | Poor | $559K | $5.3M |