Contracts
0
Contract value
—
Work orders
20
WO cost captured
$679K
Instruments where this vendor is the counterparty.
This vendor has no instruments in the contract book — their EDC engagement is through work orders below.
Contractor assignments with cost captured to the asset.
| WO | Subject | Asset | Status | Cost |
|---|---|---|---|---|
| WO-2026-00122 | Scheduled inspection #2 | Sunset Park / Brooklyn Army Terminal Landing Barge & Gangway | Assigned | — |
| WO-2026-00140 | Scheduled inspection #1 | Primary Building | Completed | $6,884 |
| WO-2026-00108 | Scheduled inspection #2 | East 34th Street Ferry Landing Landing Barge & Gangway | Verified | $49,124 |
| WO-2026-00061 | Scheduled inspection #3 | SBMT Wharf & Heavy-Lift Pad | Assigned | — |
| WO-2026-00026 | Corrective repair — substructure (critical-fail) | Primary Building | In progress | $307,845 |
| WO-2026-00001 | Corrective repair — substructure (critical-fail) | BAT Building B | Assigned | — |
| WO-2025-00160 | Scheduled PM #1 | 1472 Broadway |
| Completed |
| $48,842 |
| WO-2025-00288 | Contractual obligation — Tenant maintenance covenant — Altronix Corp — 140 58th Street | Bush Terminal Building 140 (58th St) | Verified | $5,191 |
| WO-2025-00080 | Corrective repair — electrical (critical-fail) | Primary Building | Scheduled | — |
| WO-2025-00023 | Corrective repair — scour (critical-fail) | Cruise Terminal Pier 92 | Scheduled | — |
| WO-2025-00296 | Contractual obligation — Tenant maintenance covenant — R. Ben Toe Corporation — 140 58th Street | Bush Terminal Building 140 (58th St) | Cancelled | — |
| WO-2025-00295 | Contractual obligation — Tenant maintenance covenant — Calypso Wholesale Distributors, LLC — 201 Powell Street | Bush Terminal Building 140 (58th St) | Closed | $33,115 |
| WO-2025-00026 | Corrective repair — pile caps (critical-fail) | Howland Hook Container Wharf | Assigned | — |
| WO-2025-00233 | Scheduled inspection #3 | Primary Building | Scheduled | — |
| WO-2025-00097 | Marine substructure repair required — marine inspection | Midtown West / Pier 79 (W 39th St) Landing Barge & Gangway | Scheduled | — |
| WO-2025-00054 | Corrective repair — scour (critical-fail) | Soundview (Clason Point) Landing Barge & Gangway | In progress | $148,964 |
| WO-2025-00273 | Scheduled PM #2 | Bush Terminal Building 140 (58th St) | Closed | $24,248 |
| WO-2025-00090 | Elevators repair required — building inspection | 7 Times Square | Scheduled | — |
| WO-2024-00007 | Corrective repair — elevators (critical-fail) | 1472 Broadway | Assigned | — |
| WO-2024-00059 | Scheduled inspection #1 | Brooklyn Wholesale Meat Market Hall | Verified | $54,763 |