Contracts
0
Contract value
—
Work orders
13
WO cost captured
$418K
Instruments where this vendor is the counterparty.
This vendor has no instruments in the contract book — their EDC engagement is through work orders below.
Contractor assignments with cost captured to the asset.
| WO | Subject | Asset | Status | Cost |
|---|---|---|---|---|
| WO-2026-00024 | Corrective repair — marine substructure (critical-fail) | Sunset Park / Brooklyn Army Terminal Landing Barge & Gangway | Assigned | — |
| WO-2026-00144 | Scheduled PM #1 | Bush Terminal Building 140 (58th St) | Completed | $49,598 |
| WO-2025-00230 | Scheduled PM #2 | Waterfront Structure | Assigned | — |
| WO-2025-00066 | Corrective repair — plumbing (critical-fail) | Primary Building | In progress | $125,901 |
| WO-2025-00028 | Corrective repair — hvac (critical-fail) | 3 Times Square | Scheduled | — |
| WO-2025-00284 | Tenant maintenance request | Bush Terminal Building 140 (58th St) | Completed | $32,418 |
| WO-2025-00157 | Scheduled inspection #1 | Teleport Office Campus |
| Assigned |
| — |
| WO-2025-00294 | Contractual obligation — Tenant maintenance covenant — Trans Union Transport INC. — 191 Powell Street | Bush Terminal Building 140 (58th St) | Verified | $10,394 |
| WO-2025-00063 | Corrective repair — pile caps (critical-fail) | Waterfront Structure | Scheduled | — |
| WO-2025-00056 | Corrective repair — piles (critical-fail) | South Williamsburg (Schaefer Landing) Landing Barge & Gangway | In progress | $163,163 |
| WO-2024-00047 | Scheduled inspection #1 | Bush Terminal Pier 6 | Verified | $36,794 |
| WO-2024-00008 | Corrective repair — roof (critical-fail) | 620 Eighth Avenue (NYT Tower) | Scheduled | — |
| WO-2024-00003 | Corrective repair — elevators (critical-fail) | Hunts Point Cooperative Meat Market | Scheduled | — |