Contracts
0
Contract value
—
Work orders
16
WO cost captured
$4.1M
Instruments where this vendor is the counterparty.
This vendor has no instruments in the contract book — their EDC engagement is through work orders below.
Contractor assignments with cost captured to the asset.
| WO | Subject | Asset | Status | Cost |
|---|---|---|---|---|
| WO-2026-00119 | Scheduled PM #2 | Rockaway (Beach 108th St) Landing Barge & Gangway | Assigned | — |
| WO-2026-00160 | Tenant maintenance request | Bush Terminal Building 140 (58th St) | In progress | $22,474 |
| WO-2025-00195 | Scheduled inspection #3 | Red Hook / Atlantic Basin Landing Barge & Gangway | Scheduled | — |
| WO-2025-00182 | Scheduled PM #1 | East 90th Street Ferry Landing Landing Barge & Gangway | Completed | $51,009 |
| WO-2025-00223 | Scheduled PM #1 | Primary Building | Completed | $43,887 |
| WO-2025-00259 | Scheduled PM #1 | Bush Terminal Building 140 (58th St) | Assigned | — |
| WO-2025-00033 | Corrective repair — piles (critical-fail) | Bay Ridge (American Veterans Memorial Pier, 69th St) Landing Barge & Gangway |
| In progress |
| $60,470 |
| WO-2025-00226 | Scheduled PM #1 | Primary Building | Completed | $68,749 |
| WO-2025-00207 | Scheduled PM #2 | Stuyvesant Cove (E 20th St) Landing Barge & Gangway | Closed | $20,253 |
| WO-2025-00282 | Tenant maintenance request | Bush Terminal Building 140 (58th St) | Completed | $31,819 |
| WO-2025-00234 | Scheduled PM #1 | Primary Building | Verified | $32,686 |
| WO-2025-00068 | Corrective repair — elevators (critical-fail) | Primary Building | In progress | $45,728 |
| WO-2025-00036 | Corrective repair — underwater utilities (critical-fail) | Corlears Hook (Lower East Side) Landing Barge & Gangway | In progress | $137,709 |
| WO-2024-00039 | Shell repair required — building inspection | Primary Building | Verified | $3,520,640 |
| WO-2024-00106 | Scheduled PM #1 | Waterfront Structure | Completed | $45,283 |
| WO-2024-00021 | Corrective repair — underwater utilities (critical-fail) | Greenpoint (India Street Pier) Landing Barge & Gangway | Scheduled | — |