Work Orders
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
Work Order
BAT Building B· Brooklyn Army Terminal· Requested Oct 18, 2024
Who pays for this repair — surfaced from the linked lease at dispatch.
Shared responsibility (tenant + landlord) — per lease §7
Lease clause §7 governs this repair; the specific lease is not linked to this work order.
Captured costs roll up to the asset ledger.
Labor, material, contractor, and other costs appear here once work begins.
Where this work order came from and what it touches.
Status milestones (no audit events recorded yet).