Work Orders
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
Work Order
Astoria (Hallets Cove) Landing Barge & Gangway· NYC Ferry· Requested Nov 14, 2024
Who pays for this repair — surfaced from the linked lease at dispatch.
Shared responsibility (tenant + landlord) — per lease §7
Lease clause §7 governs this repair; the specific lease is not linked to this work order.
Captured costs roll up to the asset ledger.
| Category | Source | Amount |
|---|---|---|
| Labor | labor charge | $13,096 |
| Material | material charge | $9,354 |
| Contractor | contractor charge | $16,837 |
| Equipment | equipment charge | $2,806 |
| Misc | misc charge | $4,677 |
| Total | $46,770 |
Where this work order came from and what it touches.
Status milestones (no audit events recorded yet).