Work Orders
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
Work Order
Primary Building· Commercial Leases· Requested May 31, 2026
Who pays for this repair — surfaced from the linked lease at dispatch.
Shared responsibility (tenant + landlord) — per lease §7
Lease clause §7 governs this repair; the specific lease is not linked to this work order.
Captured costs roll up to the asset ledger.
| Category | Source | Amount |
|---|---|---|
| Labor | labor charge | $37,881 |
| Material | material charge | $17,826 |
| Contractor | contractor charge | $41,223 |
| Equipment | equipment charge | $3,342 |
| Misc | misc charge | $11,141 |
| Total | $111,414 |
Where this work order came from and what it touches.
Status milestones (no audit events recorded yet).