Work Orders
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
Work Order
Battery Park City / Vesey St (Brookfield Place) Landing Barge & Gangway· NYC Ferry· Requested Apr 10, 2025
Who pays for this repair — surfaced from the linked lease at dispatch.
EDC (landlord) is responsible for this repair.
No tenant cost recovery applies. Structural, roof, exterior, and common building systems sit with the landlord under EDC's standard lease terms.
Captured costs roll up to the asset ledger.
Labor, material, contractor, and other costs appear here once work begins.
Where this work order came from and what it touches.
Status milestones (no audit events recorded yet).