Work Orders
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
The portfolio-wide work queue — corrective, preventive, inspection, contractual-obligation, and tenant-request work.
| Loading | |||||||||
Work Order
Bush Terminal Building 140 (58th St)· Commercial Leases· Requested May 27, 2025
Who pays for this repair — surfaced from the linked lease at dispatch.
Tenant is responsible — per lease §7
Landlord shall maintain and repair the roof, foundation, structural elements, exterior walls, and building systems serving the Premises in common. Tenant shall, at its sole cost, maintain the interior of the Premises, including all HVAC filters and non-structural fixtures, in good order and repair. Tenant shall be responsible for its own janitorial and refuse removal.
View clause in contractCaptured costs roll up to the asset ledger.
| Category | Source | Amount |
|---|---|---|
| Labor | labor charge | $8,753 |
| Material | material charge | $6,484 |
| Contractor | contractor charge | $10,050 |
| Equipment | equipment charge | $1,945 |
| Misc | misc charge | $5,187 |
| Total | $32,418 |
Where this work order came from and what it touches.
Status milestones (no audit events recorded yet).