Below-water dive inspection. Divers rated the submerged marine substructure — piles, pile caps, scour, and underwater utilities — per the ASCE waterfront manual.
Cruise Terminal Pier 88
Deficiency captured; see backlog.
Cruise Terminal Pier 88
Marine substructure repair required — marine inspection
Deficiency captured; see backlog.
Cruise Terminal Pier 88
Deficiency captured; see backlog.
Cruise Terminal Pier 88
Cruise Terminal Pier 88
Deficiency captured; see backlog.
Piles repair required — marine inspection
Pile caps repair required — marine inspection
Underwater utilities repair required — marine inspection